MICROVAST BATTERY MANUFACTURING PLANT

Project Details

BCMason Group worked as an Infrastructure subcontractor under DPR Construction to complete 1,000 feet of sanitary sewer line, which included multiple manhole structures. The project was located at the Microvast battery manufacturing plant in Clarksville, Tennessee. This industrial work included an emphasis on safety, as the installation was as deep as 11 feet in some areas. Due to the depth and the soil type, the project required the use of trench boxes and additional safety measures.

 

Our team also had the opportunity to utilize RodRadar’s unprecedented technology platform that automatically detects underground utility infrastructure in real time, on-site, without the need for expert analysis. 

​

OUR ROLE

Subcontractor

​

PROJECT COST

Under $1M

​

COMPLETION DATE

Summer 2023